Custom gunite pool and raised spa built by Dallas Cool Pools

Home  /  Services  /  New Pool Construction

New pool construction

New pool construction in Dallas and North Texas

Custom gunite pools designed around your lot, your house and how your family will use them, for a handful of families each year.

We take on a handful of new builds each year, by choice, so every pool gets the attention it deserves. The pool itself usually takes 8 to 12 weeks to build once we dig, depending on the scope of the project.

Design first, in 3D

With 3D design available, you can see the pool and backyard before anything is dug. The layout, steps and views from inside the house are settled while changes are still free.

Built for how you’ll use it

Who will be in the pool? Young kids, teens, grandparents, a crowd on the weekend? We design for them. That might mean a tanning ledge, a spa, swim-up seating or water features that help keep the water comfortable in August.

Sized properly, not to win on price

Some builders under-design the equipment to come in cheaper. It’s like buying a big family SUV with a small four-cylinder engine. It looks right, but it can’t do the job. We size Pentair pumps, filtration and automation for the pool you’re actually getting.

What affects the cost

  • Pool size, shape and depth
  • A spa, and water or fire features
  • How much decking goes around the pool
  • Equipment, automation, lighting and heating
  • Access to the backyard for excavation
  • Soil conditions and any engineering the lot needs
  • Outdoor living added to the plan, like a covered patio or kitchen

Your line-item proposal shows every one of these, so you can adjust it to fit your budget.

What every new pool includes

  • Pentair equipment with properly sized filtration
  • Energy-efficient LED lighting
  • Freeze protection
  • Four weeks of pool service and water balancing after startup
  • Pool school, so you know how to run your equipment

Building in North Texas

Our expansive clay soil moves as it gets wet and dries out. Drainage, grading and the right engineering matter more here than in most places. We handle the engineering, the permits and the inspections, and we help you put together what your HOA needs to review.

The build

How a new pool goes together

Design, engineering and permits come first. Then the pool itself usually takes 8 to 12 weeks to build, depending on the design and the weather. Decking, patios and outdoor living add time.

  1. 01

    Design and proposal

    Site visit, measurements, 3D design and a line-item proposal.

  2. 02

    Engineering and permits

    We handle the engineering, city permits and HOA paperwork.

  3. 03

    Dig, steel and plumbing

    Excavation, then the steel frame and plumbing go in.

  4. 04

    Shell, tile and decking

    The gunite shell is shot and cured, then tile, coping and decking go in.

  5. 05

    Finish and startup

    Equipment, interior finish, water, startup and pool school.

In their words

From families who built with us

★★★★★
Rick and his wife Jessica are the absolute best to work with. Building a pool is a big investment and decision, and they treat it as such. Rick was so responsive with all my questions along the way and made it an incredibly seamless process.
SaraGoogle review
★★★★★
We had a great experience with Dallas Cool Pools during our pool construction process. We got a few proposals and they were the most down to earth company. They worked according to the schedule, even the owner was supervising in person each step and always was communicative and respectful. I’ll recommend them to anyone interested in a pool in the future.
OmarGoogle review
★★★★★
I highly recommend Dallas Cool Pools. The owner, Ricardo recently built our pool and spa, and my family has been enjoying it daily ever since. He was willing to work with our design ideas and budget, while also suggesting some great features we hadn't thought of.
StephenGoogle review
★★★★★
Ricardo with Dallas Cool Pools exceeded my expectations. His design was the most appealing and he was the most professional contractor I interacted with. Everything was on time and he did an A+ job communicating with me throughout construction. I was left with no surprises and the pool has exceed our expectations.
AaronGoogle review
★★★★★
About 2 1/2 years ago we decided to take the plunge and get a pool/hot tub for our backyard. The process was ridiculous and stressful! Until that is we sat down with Ricardo from Dallas Cool Pools. What a refreshing experience to deal with someone not overselling you but also making sure you get what you want and need in your particular pool.
JeffGoogle review
★★★★★
Rick and each of his sub-contracting teams take their respective crafts seriously and treated me, the customer, with respect by being punctual, diligent, and always available to answer any questions.
MatthewGoogle review

Pricing

What a new pool really costs in Dallas

We would rather be upfront about price now than surprise you later. A bid around $80,000 often ends up past $100,000 once the equipment and the basics are added back in. Here is what we see in Dallas:

  • Bare-bones bids, around $70,000 to $80,000. Often a basic shell with no equipment and no extras.
  • A quality pool from us, $100,000 to $110,000. Where most of our new pools realistically land.
  • Luxury builds, $150,000 or more.

Why the difference?

  • Equipment sized for your pool. A cheap filter that is too small means cleaning it every week. We size it right, so you spend your time in the pool instead.
  • An itemized proposal. Every part of the project is listed line by line, so you can see where every dollar goes.
  • Planning for the unexpected. We plan for what could come up, like hitting rock during the dig, before you sign, and if something new turns up, we talk it through with you first.

Questions

New pool FAQs

How much does a new pool cost in Dallas?
Our new pool builds typically run $100,000 to $150,000 or more, and most land toward the higher end. Size, features, the lot and any outdoor living around the pool all move the number. Your line-item proposal shows every piece.
How long does it take to build a pool?
For the pool itself, construction typically takes 8 to 12 weeks once permits are in. Decking, patios and outdoor living add time, so larger projects can run several months. Design, engineering and permits come first, so plan ahead if you want to swim by a certain date.
What kind of pools do you build?
Custom gunite pools, designed for your lot. We don’t install fiberglass.
Do you handle permits and HOA approval?
Yes. We manage the city permits and inspections, and help you prepare what your HOA needs to review.
What warranty comes with a new pool?
New builds come with a 20-year structural shell warranty. Tile, coping, decking, hardscape and plumbing carry a one-year workmanship warranty. Pentair equipment is covered for one to three years.
Do you only build new pools?
No. Most of our work is renovating existing pools and the backyards around them. If you already have a pool, a renovation may get you there for less.

Next step

Let’s design it around your family

Tell us who’ll be in the pool and how you want to use the backyard. We’ll take it from there.